• Av. Joaquim Barnola i Bassols, 6
    08760 MARTORELL Barcelona

Waste Recovery Plant “Instalación 3” T.M. Manises, Valencia | Spain

We manufactured RAMI-SYSTEM® unions for straight seamed duct of Ø 700 mm, in stainless steel, for the facilities of the Waste Recovery Plant “Instalación 3”  in Manises, Valencia.

“Instalación 3”, included in the Zonal Plan 3, management area 2 and located in the municipality of Manises (Valencia). It is designed with a capacity of 350,000 tonnes / year of waste and, together with “Instalación 1”, will assume the treatment of all the waste generated in the Metropolitan Area of ​​Valencia.

  • RAMI-SYSTEM® unions for straight seamed duct of Ø 700 mm in stainless steel

Waste Recovery Plant “Instalación 3” Manises, Valencia (Spain)

 

Project date: 2019
Location: Manises - Spain

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

This website uses cookies for you to have the best user experience. If you continue browsing you are giving your consent for the acceptance of the aforementioned cookies and the acceptance of our cookies policy , click on the link for more information. ACEPTAR

Aviso de cookies